December 15, 2025

FacebookTwitterInstagramYouTube
  • Home
  • Events
  • NEWS
    • Top Stories
    • National News
    • National Sports
  • Contests
  • Media
    • Photos
    • Videos
  • On-Air
    • Kat & Ku`ehu
    • G. Cruz
    • Kaohu James
  • Podcasts
    • KWXX Mauna Loa Eruption Updates
    • Island Conversations
    • COVID-19 Interview
  • Contact
  • Info
  • FCC Applications
  • Advertise
  • Search
MENU
  • Home
  • Events
  • NEWS
    • Top Stories
    • National News
    • National Sports
  • Contests
  • Media
    • Photos
    • Videos
  • On-Air
    • Kat & Ku`ehu
    • G. Cruz
    • Kaohu James
  • Podcasts
    • KWXX Mauna Loa Eruption Updates
    • Island Conversations
    • COVID-19 Interview
  • Contact
  • Info
  • FCC Applications
  • Advertise
  • Search

Over $1 Billion in Federal Funding Authorized for Red Hill Closure

December 27, 2022 at 5:15 am tdemartini
  • Blogs
  • Tweet
  • Share
  • Reddit
  • +1
  • Pocket
  • LinkedIn
hawaii-water-contaminated

President Biden signed into law the Fiscal Year 2023 National Defense Authorization Act (NDAA) authorizing $1 billion for the de-fueling and closure of Red Hill Bulk Fuel Storage Facility. In addition, nearly $800 million was secured for other military infrastructure upgrades across the state.

Detailed information on the military provisions is available below:

Red Hill

1.     Authorizes $1 billion in funding for the Red Hill Recovery Fund.

2.     Authorizes the closure of the Red Hill Bulk Fuel Storage Facility on Oahu and $1 billion in funding to support the closure.

3.     Develops plans for

    1. the closure, clean-up, monitoring and maintenance and post-optimal closure care for the facility;
    2. environmental remediation of ground water at the facility; and
    3. how the Department will coordinate with state regulatory authorities, water utility authority, state environmental agencies and surrounding community.

4.     Directs the Department of Defense (DoD) to appoint a single point of contact to lead the closure of Red Hill and conduct an independent assessment of optimal post-closure care for the Red Hill facility.

5.     Establishes a water monitoring program at the facility.

6.     Directs a federally funded research and development to conduct a study to determine the range of feasible alternative DoD uses for the Red Hill Bulk Fuel Storage Facility and provide to the Secretary a report on the findings of the study.

7.     Directs a briefing on the efforts of the Secretary of Defense to appropriately track the health implications of fuel leaks at the Red Hill Bulk Fuel Storage Facility for members of the Armed Forces and dependents thereof, including members of each Armed Force and dependents thereof.

    1. While not a part of NDAA, the military is taking additional steps to address health implications, including standing up the Red Hill Clinic, administered by the Defense Health Agency, which will be the main medical agency for symptoms and conditions related to the water contamination.

Delivering for Hawaiʻi

1.     Directs the Secretary of the Navy to pay for the cost to transfer customers off the Navy’s electrical system at Kalaeloa to a new system operated by Hawaiian Electric.

2.     Authorizes up to $40 million in funding for planning and design for the Waterfront Production Facility at Pearl Harbor Shipyard.

3.     Authorizes $446 million for the replacement of Dry Dock 3 at Joint Base Pearl Harbor-Hickham (JBPHH).

4.     Authorizes $7 million for the construction of an aircraft maintenance hangar at Marine Corps Base Kaneohe Bay.

5.     Authorizes $10 million for increasing safety and modernization of missile magazines at JBPHH.

6.     Authorizes $57.9 million for the Bachelor Enlisted Quarters at Marine Corps Base Kaneohe Bay.

7.     Authorizes $40 million for the C-40 Aircraft Maintenance Hangar at Marine Corps Base Kaneohe Bay.

8.     Authorizes $29 million for the National Guard Readiness Center, Kalaeloa.

9.     Authorizes $89 million for the Air Force Research Laboratory, Maui Experimental Site.

10.  Authorizes $25 million for the Company Operations Facility, Schofield Barracks.

11.  Authorizes $33 million for Water System Upgrades at Fort Shafter.

12.  Authorizes $38 million for the Potable Water System at Tripler Army Medical Center.

13.  Authorizes a 4.6% salary increase for servicemembers.

Strengthening Our Ability to Protect the Pacific Region

1.     Directs INDOPACOM to submit a report on the international agreements necessary to achieve the necessary force presence in the Pacific, and a plan for entering into those agreements.

2.     Directs the Secretary of the Navy to implement the Comptroller General’s recommendations to the Shipyard Improvement Optimization Plan (SIOP) to better understand anticipated costs of the program.

3.     Sets a floor of at least 31 amphibious assault ships in the U.S. fleet.

4.     Authorizes $78.9 million for INDOPACOM theater exercises.

5.     Authorizes $19 million for the  Pacific Multi-Domain Training and Experimentation Capability (PMTEC) to connect training ranges across the Pacific.

6.     Authorizes $2.4 million for INDOPACOM Pacific Movement Coordination Center to support collaboration and information sharing across the Pacific region.

7.     Authorizes $8 million for the Asia Pacific Regional Initiative (APRI) to strengthen the U.S. military’s relationships with Pacific region partners.

8.     Authorizes $250 million for LPD Flight II Advance Procurement to support the procurement of additional amphibious transport docks.

Prioritizing Sustainability

1.     Requires DoD to transition fully to electric and other alternatively-fueled vehicles for its fleet of non-tactical vehicles by 2035, helping reduce the DoD’s reliance on fossil fuels.

2.     Authorizes $176 million for the Readiness and Environmental Protection Initiative (REPI) to make military installations more resilient to climate change and land use conversion.

3.     Authorizes $30 million to improve the reliability of the electrical grid at Joint Base Pearl Harbor-Hickam under the Energy Resilience and Conservation Investment Program (ERCIP).

 

AP Photo

Tags: Fiscal Year 2023, infrastructure, President Joe Biden, Red Hill Bulk Fuel Storage Facility
Previous Story
Waipiʻo Valley Road Closures Scheduled for This Week
Next Story
New Law Protects Export of Sacred Indigenous Items From U.S.

Facebook

KWXX FM

Twitter

Tweets by KWXX

"Hawaii's Feel Good Island Music Radio Station"

Info

  • Home
  • Contests
  • Socialize
  • Contact Us
  • Station Info
  • EEO
  • FCC Public File (KWXX)
  • FCC Public File (KAOY)

National News

Rob Reiner and Michele Singer Reiner attend New York Stem Cell Foundation Gala and Science Fair at Jazz at Lincoln Center on October 10^ 2023

Rob Reiner and wife Michelle Singer found dead in their Los Angeles home

Van Wickle Gates is the main entrance to Brown University main campus on Prospect Street at College Street on College Hill in city of Providence^ Rhode Island RI^ USA.

Person of interest detained after Brown University shooting that killed 2, injur...

Social

Facebook Facebook Twitter Twitter Instagram Instagram YouTube YouTube
KWXX – Hilo, HI © 2025 Powered by OneCMS™ | Served by InterTech Media LLC
Are you still listening?
3628718300
Mozilla/5.0 AppleWebKit/537.36 (KHTML, like Gecko; compatible; ClaudeBot/1.0; +claudebot@anthropic.com)
d7c7998905897838c71e71d412109044d8a79278
1
Loading...