May 15, 2025

FacebookTwitterInstagramYouTube
  • Home
  • Events
  • NEWS
    • Top Stories
    • National News
    • National Sports
  • Current Contests
  • Photos/Video
    • Photos
    • Videos
  • On-Air
    • Kat & Ku`ehu
    • G. Cruz
    • Kaohu James
  • Podcasts
    • KWXX Mauna Loa Eruption Updates
    • Island Conversations
    • COVID-19 Interview
  • Contact
  • Info
  • Search
  • FCC Applications
MENU
  • Home
  • Events
  • NEWS
    • Top Stories
    • National News
    • National Sports
  • Current Contests
  • Photos/Video
    • Photos
    • Videos
  • On-Air
    • Kat & Ku`ehu
    • G. Cruz
    • Kaohu James
  • Podcasts
    • KWXX Mauna Loa Eruption Updates
    • Island Conversations
    • COVID-19 Interview
  • Contact
  • Info
  • Search
  • FCC Applications

Emergency Proclamation Issued for Hilo Wastewater Treatment Plant

February 12, 2025 at 5:05 am tdemartini
  • Blogs
  • Tweet
  • Share
  • Reddit
  • +1
  • Pocket
  • LinkedIn
hilo-wastewater-treatment-plant-hawaii-county-photo

As a proactive measure to protect public health and safety, Mayor Kimo Alameda signed an emergency proclamation covering the Hilo Wastewater Treatment Plant, which is slated for a major rehabilitation project.

The proclamation authorizes emergency management measures to be taken in the event of a wastewater infrastructure failure. Engineering assessments have noted mechanical defects, structural deterioration, and extensive corrosion at the treatment plant that could result in a sewage spill at the facility, while deficiencies have also been found in the sewer collection system in Hilo.

In a press release Mayor Alameda said, “It is our duty to protect the health and safety of our residents as well as our environment. By moving forward with repairs and upgrades to our Hilo Wastewater Treatment Plant, we are making critical investments in our infrastructure that will serve the community for years to come.”

To address these infrastructure needs, the County has awarded a $337 million contract to Nan Inc. for the Hilo Wastewater Treatment Plant Rehabilitation and Replacement Project. A Notice to Proceed is anticipated in early March and the project is expected to take approximately five years to complete.

Additionally, Mayor Alameda has directed staff to develop a response and mitigation plan so that the County is prepared to address a sewage spill at any critical infrastructure location.

 The treatment plant project focuses on rehabilitating the primary and secondary treatment facilities by replacing critical infrastructure and integrating modern technology. Work will be done in phases to ensure the treatment plant remains operational during construction and safeguards will be in place to aid in emergency response.

Key repairs and upgrades include:

  • Improved waste removal: By replacing the headworks system, large debris and sand will be removed more effectively.
  • Better sludge treatment: New primary and secondary digesters, an anaerobic digester, and solids handling and digester control buildings will be constructed to improve waste processing.
  • Upgraded equipment: Outdated equipment will be replaced, water quality processes will be improved, and advanced odor-control systems will be installed.
  • Modern technology: A plant-wide supervisory control and data acquisition system will be implemented to automate and monitor plant operations. A new control and server room will be installed for better system management.
  • Increased reliability: The main switchboard, pumping stations, and critical facilities will be upgraded to make the plant more efficient and reliable.

The treatment plant, built in the early 1990s, serves about 30,000 residents and treats 3 million gallons of wastewater per day on average. In March 2024, the County entered into an Administrative Order on Consent with the U.S. Environmental Protection Agency to repair or replace the facility and address other wastewater infrastructure deficiencies.

 Photo credit: Office of Mayor Kimo Alameda

Tags: emergency proclamation, Hilo Wastewater Treatment Plant, Mayor Kimo Alameda
Previous Story
Kīlauea Eruption Resumes
Next Story
State Lawmakers Seek Tougher Fireworks Enforcement

Facebook

Twitter

Tweets by KWXX

"Hawaii's Feel Good Island Music Radio Station"

Info

  • Home
  • Contests
  • Socialize
  • Contact Us
  • Station Info
  • EEO
  • FCC Public File (KWXX)
  • FCC Public File (KAOY)

National News

Demonstrators gather during a protest in front of the White House in Washington^ DC^ on April 19^ 2025.

Judge orders release of Georgetown scholar Badar Khan Suri after months in ICE c...

Aircraft landing at Newark^ New Jersey^ USA 3D rendering illustration. Arrival in the city with the glass airport terminal and reflection of jet plane. Travel^ business^ tourism and transport.

FAA holds talks with major airlines regarding flight delays at Newark Airport

Social

Facebook Facebook Twitter Twitter Instagram Instagram YouTube YouTube
© 2025 KWXX - Hilo, HI Powered by OneCMS™ | Served by InterTech Media LLC
Are you still listening?
309685382
Mozilla/5.0 AppleWebKit/537.36 (KHTML, like Gecko; compatible; ClaudeBot/1.0; +claudebot@anthropic.com)
e75fc6f2651caab821f0d4ad05478a721dde8df3
1
Loading...